






EVM 128GB 2.5 SATA SATA 3 Internal Solid State Drive (SSD)
Feature of EVM 128GB 2.5 SATA SATA 3 Internal Solid State Drive (SSD)
128GB SSD 2.5" INCH SATA
- 25" Inch SATA Solid State Drive
- High Performance and Low Consumption
- Safe And Relable
- Capacity 128GB
- 3D TLC NAND FLASH
- Life expectancy of 1 million hours MTBF
- Interface SATA 3.0 Gb/s SATA 6.0 Gb/s
- Enhance your SSD computer with the latest technology for blazing-fast performance and reliability
High Performance
A full-capacity 128GB SSD designed to provide remarkable performance and optimised to provide functional system responsiveness with incredible boot, loading and transfer times.
Compatible with the market Mainstream machines, like desktop, Laptop, server, CCTV system and other devices
Intensify the functionality of your system by using this EVM 128GB 2.5 SATA SATA 3 Internal Solid State Drive (SSD)2.5-inch SATA SSD for Desktop or Laptop. It comes with a 128GB storage capacity to hold huge chunks of files and allow faster transfers. It provides brilliant performance with next-gen 3D NAND. It offers a shockproof body and overheat protection for longer life. Besides, its sudden power-off recovery and NCQ add to its utility.
Designed for mainstream PCs and laptops for personal, gaming and business use Advanced Drive Management through Software to help you manage the drive. User-friendly tools help keep your drives up to date, monitor drive health and speed and even boost performance. Upgrade to affordable SSD performance with next-gen 3D NAND. Leverage a SATA SSD that provides up to 30× faster speeds than hard drives.
Easily upgrade with a 2.5x7mm form factor and SATA connection that allows for universal swap out of SATA drives Remarkable transfer speeds that enable faster bootup and improved overall system performance. The advanced SLC Cache Technology allows performance boost and longer lifespan Improves battery life because it’s 45 times more energy-efficient than a typical hard drive Fast start-up, loading and file transfers.
Specifications of EVM 128GB 2.5 SATA SATA 3 Internal Solid State Drive (SSD)
| Capacity | 128GB |
| Package Dimension | 100mmx69.9mmx7mm |
| Weight | 39gm |
| Part Number | EVM25/128GB |
| Form Factor | 2.5 Inch SATA |
| Warranty | 5 Years |
| Note | *** Features, Price, Specifications are subject to change without notice. |
Product Information
Product Information
Shipping & Returns
Shipping & Returns
Description
Feature of EVM 128GB 2.5 SATA SATA 3 Internal Solid State Drive (SSD)
128GB SSD 2.5" INCH SATA
- 25" Inch SATA Solid State Drive
- High Performance and Low Consumption
- Safe And Relable
- Capacity 128GB
- 3D TLC NAND FLASH
- Life expectancy of 1 million hours MTBF
- Interface SATA 3.0 Gb/s SATA 6.0 Gb/s
- Enhance your SSD computer with the latest technology for blazing-fast performance and reliability
High Performance
A full-capacity 128GB SSD designed to provide remarkable performance and optimised to provide functional system responsiveness with incredible boot, loading and transfer times.
Compatible with the market Mainstream machines, like desktop, Laptop, server, CCTV system and other devices
Intensify the functionality of your system by using this EVM 128GB 2.5 SATA SATA 3 Internal Solid State Drive (SSD)2.5-inch SATA SSD for Desktop or Laptop. It comes with a 128GB storage capacity to hold huge chunks of files and allow faster transfers. It provides brilliant performance with next-gen 3D NAND. It offers a shockproof body and overheat protection for longer life. Besides, its sudden power-off recovery and NCQ add to its utility.
Designed for mainstream PCs and laptops for personal, gaming and business use Advanced Drive Management through Software to help you manage the drive. User-friendly tools help keep your drives up to date, monitor drive health and speed and even boost performance. Upgrade to affordable SSD performance with next-gen 3D NAND. Leverage a SATA SSD that provides up to 30× faster speeds than hard drives.
Easily upgrade with a 2.5x7mm form factor and SATA connection that allows for universal swap out of SATA drives Remarkable transfer speeds that enable faster bootup and improved overall system performance. The advanced SLC Cache Technology allows performance boost and longer lifespan Improves battery life because it’s 45 times more energy-efficient than a typical hard drive Fast start-up, loading and file transfers.
Specifications of EVM 128GB 2.5 SATA SATA 3 Internal Solid State Drive (SSD)
| Capacity | 128GB |
| Package Dimension | 100mmx69.9mmx7mm |
| Weight | 39gm |
| Part Number | EVM25/128GB |
| Form Factor | 2.5 Inch SATA |
| Warranty | 5 Years |
| Note | *** Features, Price, Specifications are subject to change without notice. |



















